A-Frame
A-Frame Modular House Series
Steep-pitched architectural cabins tailored for eco-resorts, glamping developments, and mountain retreats.
Factory-built in Kocaeli, Turkey with high-strength galvanized steel frames, thermal insulation options, and international structural compliance.
A-Frame
Steep-pitched architectural cabins tailored for eco-resorts, glamping developments, and mountain retreats.
Residential
Expandable single and multi-module residential units equipped with pre-installed MEP and premium wall finishes.
Tiny Living
Road-ready compact living units engineered for rapid deployment, off-grid installation, and seasonal housing.
Zima Series
Compact 2-bedroom floor plan engineered with dual-slope insulated roofing and panoramic double-glazed joinery.
Neva Series
Contemporary flat-roof modular residence with integrated terrace, optimized for European and Middle East climates.
Lena Series
High-efficiency modular layout designed for quick sea-container loading and fast site assembly by small crews.
Nexa Prefab delivers industrial-grade modular construction engineered to withstand severe wind loads, seismic activity, and temperature extremes from -20 °C to +55 °C.
| Component | Technical Specification | Compliance & Quality Benchmark |
|---|---|---|
| Primary Structural Framing | Cold-formed high-tensile galvanized steel (S350GD + Z275) | EN 10346, DIN EN 1993 (Eurocode 3) |
| Wall Panel Insulation | 50mm - 150mm Rockwool (100 kg/m³) or High-Density PIR Core | Class A1 Fire Resistance (EN 13501-1) |
| Roof Structure & Load | Insulated sandwich panels with integrated rainwater drainage (1.5 kN/m² snow load capacity) | CE Certified / ISO 9001:2015 Manufacturing Control |
| Windows & Exterior Doors | Thermal-break aluminum or 5-chamber PVC frames with double/triple argon-filled glazing | EN 12207 Air Permeability / EN 12208 Watertightness |
| MEP & Utility Routing | Pre-installed electrical conduits, PEX plumbing lines, and fire-retardant distribution boxes | IEC International Electrical Standards |
By producing directly in Kocaeli, Turkey, Nexa Prefab eliminates intermediary markups, guaranteeing transparent B2B contract pricing and strict timeline adherence.
Modular units are designed for flat-pack packaging or standard 40ft High Cube container shipping, reducing freight expenditure per square meter by up to 40%.
Every order includes complete CAD/BIM architectural shop drawings, structural calculation packs, structural engineering stamps, and customs documentation.
Turkey has established itself as an international hub for off-site modular construction. Nexa Prefab combines state-of-the-art robotic steel roll-forming with rigorous quality control to serve commercial developers, mining operations, resort operators, and public sector contractors worldwide.
Unlike traditional site-built structures subject to weather delays and inconsistent craftsmanship, every Nexa Prefab modular house is produced inside our specialized Kocaeli facility. Fixed jigs ensure millimeter-level dimensional accuracy, airtight panel joining, and superior sound insulation properties.
Whether you require a single luxury A-frame cabin or a 500-unit workforce accommodation camp, our modular building systems scale seamlessly. Interlocking container foundations and standardized frame connections allow multi-story stackability and future layout expansion with zero structural compromise.
We utilize 100% recyclable structural steel framing and low-VOC interior wall panels. High thermal mass insulation layers significantly decrease operational HVAC energy consumption, making our modular houses ideal for sustainable tourism and remote commercial outposts.
Turkey offers an optimal combination of European-grade engineering standards (ISO/CE certifications), competitive steel procurement costs, high production capacity, and strategic port logistics in Kocaeli with rapid sea freight access to the Middle East, Europe, Africa, and the Americas.
Standard modular units exit our facility within 15 to 25 working days after drawing approval. Multi-unit commercial contracts take between 30 and 50 days. Sea transit times typically range from 7–12 days to Gulf ports, 10–18 days to Western Europe, and 14–22 days to West Africa.
Yes. Structural calculations are tailored per project location to account for localized wind pressure, snow loading, seismic zone ratings, and ambient temperature ranges (from humid coastal zones to sub-zero mountain environments).
We supply both configurations. Fully assembled modules ship ready for immediate utility connection, while flat-packed panel systems maximize container loading efficiency for large volume orders requiring reduced freight costs.
Connect directly with our engineering team in Kocaeli, Turkey for customized CAD drawings, structural calculations, and competitive FOB/CIF export pricing.